Skip to content

Documents

All of our consultation materials, including our Grid Connection Strategy, Routing and Consultation document and a downloadable feedback form can be viewed here.

Landowner documents

Environmental and engineering surveys (PDF, 0.6MB)

Landowner payments (PDF, 1.1MB)

Non-statutory project and consultation documents Green GEN Towy Usk

On this page you can view and download a section of materials that provide more information about our proposals for the Towy Usk connection.

Round one consultation documents - spring 2023

Consultation information leaflet (PDF, 10.6MB)

Consultation feedback form (PDF, 0.5MB)

Consultation event panels (PDF, 9.9MB)

Newspaper adverts (PDF, 0.3MB)

Green GEN Phase One Grid Connection Strategy (PDF, 5.5MB)

Routeing and Consultation Document - Complete document (ZIP, 124.1MB)

Round one Routeing and Consultation Document - Main Text (PDF, 1.5MB)

Routeing and Consultation Document - Appendices (PDF, 5.2MB)

Routeing and Consultation Document - Figures 1 (PDF, 44.6MB)

Routeing and Consultation Document - Figures 2 (PDF, 38.4MB)

Routeing and Consultation Document - Figures 3 (PDF, 37.6MB)

Approach to routeing Grid infrastructure in Wales (PDF, 8.9MB)

Electric and Magnetic Fields (EMF) Information sheet (PDF, 11.3MB)

Round one non-statutory Consultation Feedback Report



Round two consultation documents - spring 2024

Consultation brochure

Consultation information leaflet

Consultation feedback form

Newspaper adverts

2024 Updated Green GEN Phase One Grid Connection Strategy

Addendum Phase One Grid Connection Strategy

Draft route alignment map

Section 1 - Nant Mithil Energy Park to Aberedw Hill

Section 2 - Aberedw Hill to Llangammarch Wells

Section 3 - Llangammarch Wells to Llandovery

Section 4 - Llandovery to Llandeilo

Section 5 - Llandeilo to Llandyfaelog

Green GEN Towy Usk EMF information leaflet